Tel: (01622) 820643
Home
Projects
Mereway Tilting Weir (2019-2020)
Canal Basin (2017-2019)
Lake 4 Pumping Station (2017-2018)
Ipswich Floodgates (2018-2019)
Missing Link Footbridge (2017-2018)
Orton Weir (2018)
Queenborough Barrier (2015-2018)
Offord Sluice (2016)
TEAM 2100 (2015 – 2025)
Hydrofluoric and Nitric Acid Wash Plant (2014)
Wixoe Pumping Station (2015)
Molesey Weir A+B (2010-2014)
Sunbury Lock (2014)
Brede Sluice Tidal Barrier (2013)
Eldridges Radial Gate (2010)
Flovac Pressure Vessels (2009)
Power station gas injection module (2008)
Yalding Bascule Bridge (2005)
East Peckham Radial Gate (1998)
Services
Design and Analysis
River Infrastructure
Manufacturing capabilities
Pipework and Pressure Vessels
Flood Gates
Water treatment plant
Bridges and Walkways
Electrical Control Sysytems
Hydraulics
Accreditations
Contact Us
Home
Projects
Mereway Tilting Weir (2019-2020)
Canal Basin (2017-2019)
Lake 4 Pumping Station (2017-2018)
Ipswich Floodgates (2018-2019)
Missing Link Footbridge (2017-2018)
Orton Weir (2018)
Queenborough Barrier (2015-2018)
Offord Sluice (2016)
TEAM 2100 (2015 – 2025)
Hydrofluoric and Nitric Acid Wash Plant (2014)
Wixoe Pumping Station (2015)
Molesey Weir A+B (2010-2014)
Sunbury Lock (2014)
Brede Sluice Tidal Barrier (2013)
Eldridges Radial Gate (2010)
Flovac Pressure Vessels (2009)
Power station gas injection module (2008)
Yalding Bascule Bridge (2005)
East Peckham Radial Gate (1998)
Services
Design and Analysis
River Infrastructure
Manufacturing capabilities
Pipework and Pressure Vessels
Flood Gates
Water treatment plant
Bridges and Walkways
Electrical Control Sysytems
Hydraulics
Accreditations
Contact Us
Services
Design and Analysis
River Infrastructure
Manufacturing capabilities
Pipework and Pressure Vessels
Flood Gates
Water treatment plant
Bridges and Walkways
Electrical Control Sysytems
Hydraulics